Winners!!
![](https://inklingllp.com/wp-content/uploads/2024/03/Hugging_cropped-595x224.jpg)
We are thrilled to have won Consultancy of the year (up to 50 employees) at the CIBSE Building Performance Awards 2024 last month. <CR> This recognition means the world to us. We are very fortunate to work with some amazing clients and collaborators (you know who you are), and we are grateful to the CIBSE […]
Read More- Posted by
Susie Diamond
- Posted in Awards, CIBSE, Claire Das Bhaumik, Marcus Haydon, Susie Diamond, Values
Mar, 21, 2024
Comments Off on Winners!!
Delivering Net Zero
![](https://inklingllp.com/wp-content/uploads/2023/07/Boroughs-424x224.png)
This blog post is a hymn to collaboration. Late last year Inkling were delighted to be invited to collaborate with four other consultancies on a piece of work commissioned by a consortium of 18 London Boroughs. In light of a revision to Part L, the boroughs worked together to procure this research to help inform […]
Read More- Posted by
Susie Diamond
- Posted in Publications, Research
Jul, 12, 2023
Comments Off on Delivering Net Zero
LETI Operational Modelling Guide #OMG
![](https://inklingllp.com/wp-content/uploads/2023/04/Screenshot-2023-04-18-164913-2-595x224.jpg)
Inkling have played a pivotal role in creating the LETI Operational Modelling Guide that was published this week. The guide is free to download from the LETI website here: https://www.leti.uk/omg I (Susie) was a lead author (together with Tom Gwilliam from Etude) and both Claire and Marcus were involved with the workstream and helped with […]
Read More- Posted by
Susie Diamond
- Posted in LETI, Publications, Susie Diamond
Apr, 18, 2023
Comments Off on LETI Operational Modelling Guide #OMG
TM54 gets a refresh
![](https://inklingllp.com/wp-content/uploads/2022/03/image001-453x224.png)
Inkling are proud to have been on the working group delivering the newly published 2022 update to CIBSE TM54. The original version was published in 2013, and has become the central protocol for evaluating the operational energy performance of buildings at the design stage. I have always liked its flexible approach, allowing modellers to exercise […]
Read More- Posted by
Susie Diamond
- Posted in CIBSE, Publications, Susie Diamond
Mar, 16, 2022
Comments Off on TM54 gets a refresh
Inkling Blog #3: Closing the Building Performance Gap
Our last Blog identified a number of âPerformance Gapsâ caused by a wide spectrum of conceptual and quality issues ranging from a lack of clarity in the industry regarding building performance criteria to poor build quality on site. So, what can we do to close these gaps? As engineers, modellers and designers we […]
Read More- Posted by
Claire Das Bhaumik
- Posted in Claire Das Bhaumik, Research, Values
Oct, 23, 2014
Comments Off on Inkling Blog #3: Closing the Building Performance Gap
Mind the ‘Performance Gap’ – Inkling offering CIBSE TM54 predicted in-use energy modelling
![Post Image](https://inklingllp.com/wp-content/uploads/2014/05/Lighting-energy-use-300x181.jpg)
The “Performance Gap” – the difference between design predictions and operational energy use – is a serious issue for our industry. The CarbonBuzz web site shows that many buildings consume between 1.5 and 2.5 times the predicted design energy. In order to address this, the industry needs both better energy-use predictions and a greater […]
- Posted by
Claire Das Bhaumik
- Posted in CIBSE, Training
May, 27, 2014
Comments Off on Mind the ‘Performance Gap’ – Inkling offering CIBSE TM54 predicted in-use energy modelling
Training workshop on implementing the CIBSE TM54 Methodology to avoid âThe Performance Gapâ
Inkling are running a series of training workshops on implementing the CIBSE TM54 Methodology to avoid âThe Performance Gapâ. The workshops will be run in collaboration with Colin Lillicrap Associates, CIBSE and The Centre for Efficient and Renewable Energy in Buildings (CEREB) the unique teaching, research and demonstration resource at London South Bank University. Next […]
Read More- Posted by
Claire Das Bhaumik
- Posted in Events
Jan, 03, 2014
Comments Off on Training workshop on implementing the CIBSE TM54 Methodology to avoid âThe Performance Gapâ